AI RAMS and method statement generator
Method statements in minutes, not hours. Trade-specific hazards and controls applied automatically, structured to CDM 2015, and routed for review and sign-off before they leave the office - so your team stops copy-pasting old documents.
RAMS generation is a core part of our AI for construction toolkit - it works from the same project data as our estimating, snagging and site reporting tools, so safety documentation is never an island.
How we de-risk this: free demo → paid discovery (half up front, half on spec delivery - you own the spec) → then the full build. No black boxes.
The AI stack we build on




Minutes
Per RAMS, not hours
CDM 2015
Aligned by default
Trade libraries
Hazards & controls built in
Competent sign-off
On every document
What is a RAMS, and how does AI generate one?
A RAMS - Risk Assessment and Method Statement - is the pairing of a risk assessment, which identifies the hazards of a task and how they are controlled, with a method statement, which sets out step by step how the work is done safely. AI generates one by taking your project details, applying the right hazards and controls from a trade-specific library, and drafting the document in the CDM 2015 structure your reviewers expect.
It is not a replacement for a competent person. The agent removes the hours of drafting and formatting; your appointed reviewer still confirms the controls are right for the job and signs off before issue. That is how we build it, as an agentic AI workflow wired into your document store through governed integrations.
From project details to a signed-off RAMS
Purpose-built AI for safety documentation - drafting, hazards, structure and reuse - working alongside your competent person rather than replacing their judgement.
Method statements in minutes
Generate a complete, structured method statement from your project details in minutes rather than hours, so a RAMS request never holds up a start on site or a subcontractor mobilisation.
Trade-specific hazard libraries
Hazards and control measures are applied automatically from libraries built for your trades and activities, so nothing common is missed because someone was working from memory or an old document.
CDM 2015 alignment
Documents are templated to the CDM 2015 structure and current HSE guidance - proper hazard identification, control measures and method sequencing - so what lands with your reviewer is already in the right shape.
Review & sign-off workflow
Every RAMS routes to your appointed competent person to review and sign off before issue, with a clear audit trail of who approved what and when - not a document emailed around and lost.
Reuse across projects
Approved RAMS and hazard libraries are reused and adapted across projects, so each new document starts from your latest approved content instead of a blank page or a hunt through old folders.
Consistent, audit-ready format
Every RAMS comes out in the same branded, consistent format regardless of who requested it, so client and principal-contractor submissions look professional and stand up to scrutiny.
Bring a live task - we’ll generate a method statement with you in the demo.
Book demoHow we build your RAMS engine
A proven four-step process that turns your best existing documents into a reusable, AI-accelerated system - with your competent person in the loop at every stage.
- 1
RAMS & hazard audit
We review the RAMS you produce today - the trades and activities you cover, your current templates, and how documents are reviewed and issued. We import your best existing RAMS to seed trade-specific hazard and control libraries.
- 2
Build the RAMS agent
We build an agent that generates method statements and risk assessments from your project details, applying the right hazards, controls and CDM 2015 structure - wired to your document store and project tools through governed integrations.
- 3
Review & sign-off loop
Every document routes to your appointed competent person to review and sign off before issue. The agent handles drafting, structure and consistency so human time goes on checking the controls are right for the job, not formatting.
- 4
Reuse & keep current
Approved RAMS and hazard libraries are reused across projects and updated as guidance and your methods change, so every new document starts from your latest, approved content.
Manual RAMS vs AI-assisted RAMS
AI does not replace your competent person - it removes the drafting and formatting that eat their day. Here is how the two approaches compare.
| Task | Manual RAMS | AI-Assisted RAMS |
|---|---|---|
| Drafting a method statement | 3-5 hours copy-pasting from old documents | Drafted in minutes from your project details |
| Hazard identification | Relying on memory, easy to miss one | Trade-specific hazard library applied automatically |
| CDM 2015 structure | Manually checked against guidance each time | Templated to current CDM 2015 structure |
| Sign-off | Emailed around, hard to track who approved | Built-in review and sign-off with an audit trail |
| Reuse | Hunting for the last similar RAMS | Reused and adapted across projects instantly |
| Consistency | Format varies by author | Standard, audit-ready format every time |
Related Services
Related Articles
Claude Enterprise Security and PII: What UK Businesses Need to Set Up (and What Stays Your Job)
Claude Enterprise security for UK businesses: settings to change, defaults that surprise, and how custom MCP servers keep PII off Anthropic's servers.
Jev vs GPT and Claude: What the Independent Benchmarks Actually Show
Jev vs GPT and Claude on routing and prompt-injection tests: accuracy, speed and cost from an independent benchmark, checked against our own 8,654-message test.
How to Use the Jev API: A Python Tutorial With Real Code and Real Responses
A practical Jev AI API tutorial in Python: your first call, yes/no and choice questions, confidence bands, batching and retries. Code we ran 11,000+ times.
Frequently asked questions about AI RAMS
See AI generate a RAMS in minutes - free demo
In a free 30-minute session we'll take a real task from one of your projects, generate a CDM 2015-aligned method statement with you, and show how the review and sign-off workflow keeps your competent person in control.
- Free demo on your real data - no commitment
- Paid discovery phase - half up front, half on spec delivery. You own the spec.
- Only then do we commit to the full build
Not ready for a call? Tell us where to reach you - we’ll reply with 3 tailored ideas for your business. No follow-up sequence, no spam.